Numerous items or “ variables ” must be considered when establishing a new or updating an existing quality program. Once the business and design of the products is fi nalized and approved, the method of manufacture variables must be considered, because there are many options and all are important to the success of the program.

The manufacturing program is identifi ed for all the components and parts for Injection Molding separated into their specifi c requirements. This will include selection of the molding machine, mold, support equipment, secondary operations, if any, and quality requirements and equipment to ensure the product meets requirements. This includes listing the information and variables determined for the manufacturing program.

Based on the known or to be completed information, the remaining operations can be completed. These are the Mold Design and build, manufacturing equipment selection, secondary operations, decoration, and assembly requirements.

The final inspection as well as packing and shipping methods must be considered. Schedules with timelines are established, and personnel are given their responsibilities to ensure the program remains on track and all components come together at the right time to have a successful program.

To assist in this area of quality, checklists will cover most of these areas by asking the necessary questions to ensure all is planned and selected when the company is ready for manufacture.

Related Posts


About the Author


Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>


普人特福的博客cnzz&51la for wordpress,cnzz for wordpress,51la for wordpress